检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张子敏 ZHANG Zimin(Shanghai Foundation Engineering Group Co.,Ltd.,Shanghai 200002,China;Shanghai Engineering Research Center of City Trenchless Construction,Shanghai 200002,China)
机构地区:[1]上海市基础工程集团有限公司,上海200002 [2]上海城市非开挖建造工程技术研究中心,上海200002
出 处:《建筑施工》2022年第1期121-123,共3页Building Construction
基 金:上海市科学技术委员会科研项目(18DZ2283100)。
摘 要:结合工程实例,对软土地层盾构区间在盾构进出洞施工中遇到的渗漏水情况进行了分析。总结了渗漏水产生的原因,并对渗漏水的来源作出了判断。通过优化加固形式和及时增加冻结加固,避免了后期同样工况下出现渗漏水的现象,总结的经验可为类似工程提供参考。Combined with an engineering example,the water leakage encountered in the construction of shield machine in and out of tunnel well in soft soil stratum was analyzed.The causes of water leakage were summarized,and the source of water leakage was evaluated.By optimizing the reinforcement form and adding freezing reinforcement in time,the phenomenon of water leakage under the same working condition in the later stage was avoided.The summarized experience can provide reference for similar projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249