检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谢结弟 XIE Jiedi(Kunshan Golden Eagle World Industrial Co.,Ltd.,Kunshan 215300,Jiangsu Province,China)
机构地区:[1]昆山金鹰天地实业有限公司,江苏省昆山市215300
出 处:《建筑电气》2022年第1期52-57,共6页Building Electricity
摘 要:商业综合体设计分项较多,设计管控较为复杂,电气设计管理不仅要把控图纸内容质量,还要协调好各部门的需求与要求,规划要点、市政配套条件、开发节奏、各部门需求、设计工期等都会影响设计进度及成果,就笔者参与项目的建造标准、外部单位要求、建设单位各部门要求及电气设计管理所涉及的内容及管控流程进行梳理。There are many design items in commercial complex,and the design control is complicated.The electrical design management shall not only control the content quality of drawings,but also coordinate the needs and requirements of various departments.The planning points,municipal supporting conditions,development pace,requirements of various departments,design period will affect the design progress and results.The construction standards,requirements of external units,requirements of various departments of the owner,and contents and control processes involved in electrical design and management of the project that the author participated in are sorted out.
关 键 词:电气设计管理 建造标准 专项深化图 设计资源管理 施工配合 用电容量 变电所分布 商业综合体
分 类 号:TU201[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.227