检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘俊 宁彬[2] Liu Jun;Ning Bin(Dongfeng Consulting Co.Ltd.,Xiangyang,Hubei 441004;Hubei University of Arts and Science,Xiangyang,Hubei 441004)
机构地区:[1]东风咨询有限公司,湖北襄阳441004 [2]湖北文理学院,湖北襄阳441004
出 处:《江西建材》2022年第1期239-241,共3页Jiangxi Building Materials
摘 要:EPC模式是当前政府投资项目中普遍采用的建设模式,比传统建设模式节约时间,提高管理效率,但实践中EPC模式对总成本较难掌控。文中提出在可行性研究、招标、设计、施工、结算等环节抓住关键点,严格控制投入,结合安居房工程项目实例,证明了EPC全过程造价控制的优势,实现工程项目经济性和时效性的统一。EPC mode is a construction mode widely used in current government investment projects,which saves time and improves management efficiency compared with the traditional construction mode,but in practice,EPC mode is difficult to control the total cost.This paper proposes to strictly control input at key points in feasibility study,bidding,design,construction,settlement and other links.Combined with the example of residential project,it proves the advantage of EPC cost control in the whole process,and achieves the unification of economy and timeliness of engineering projects.
分 类 号:TU723.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222