检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王建波 张薇 秦娜 黄文静 WANG Jian-bo;ZHANG Wei;QIN Na;HUANG Wen-jing(School of Management Engineering,Qingdao University of Technology,Qingdao 266520,China;University Research Center for Smart City Construction and Management ofShandong Province,Qingdao University of Technology,Qingdao 266520,China)
机构地区:[1]青岛理工大学管理工程学院,山东青岛266520 [2]山东省高校智慧城市建设管理研究中心(新型智库),山东青岛266520
出 处:《哈尔滨商业大学学报(自然科学版)》2022年第1期113-120,共8页Journal of Harbin University of Commerce:Natural Sciences Edition
基 金:国家自然科学基金项目(71471094);山东省自然科学基金项目(ZR2011GL021);青岛市社科规划项目(QDSKL100403);“十三五”山东省高等学校人文社会科学研究平台项目-智慧城市建设管理研究中心(新型智库)。
摘 要:为解决城市深基坑工程施工风险评价指标模糊性、随机性造成风险等级难以确定的困难,提出基于云模型的城市深基坑工程施工风险评价方法.从土方开挖、地基处理、基坑支护、排水降水和基坑监测五方面建立了城市深基坑工程施工风险评价指标体系;结合网络层次分析法(Analytic Network Process)和改进CRITIC法确定了各施工风险评价指标的权重;基于云模型理论构建了城市深基坑工程施工风险评价模型.最后对青岛蔚蓝生物深基坑工程应用所建模型进行案例分析,计算出总风险水平等级,并根据计算结果提出有针对性的措施,为青岛地区城市深基坑工程施工开挖的风险评价提供参考.The construction risk level of urban deep foundation pit engineering is difficult to determine due to the fuzzy evaluation index and randomness. As a result, a construction risk evaluation method for urban deep foundation pit engineering based on cloud model operator is proposed. Firstly, construct an urban deep foundation pit engineering construction risk evaluation index system from five aspects, earthwork excavation, foundation treatment, foundation pit support, drainage of precipitation and foundation pit monitoring. Secondly, Considering the subjective weight and objective weight, combined with Analytic Network Process and improved CRITIC method, the weight ofrisk index was determined. Then construct the construction risk evaluation model of urban deep foundation pit engineering based on cloud model method. Finally, applied that model to evaluate the construction risk of the Vland Biotech deep foundation pit project in Qingdao. And the total risk level is calculated, and targeted measures are proposed based on the calculation results to provide reference for the risk assessment of the construction excavation of the urban deep foundation pit engineering in Qingdao.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49