检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孔繁锋 Kong Fan-feng
机构地区:[1]中国十七冶集团有限公司,安徽马鞍山243000
出 处:《建筑技术开发》2022年第2期16-19,共4页Building Technology Development
摘 要:为控制桩基承台大体积混凝土的开裂,确保其施工质量,需对施工过程进行有效的温度监测与控制。为此,从3个方面(浇筑体内、浇筑体外、监测频率)提出了桩基承台大体积混凝土的温度监测要点,从2个方面(入模温度、浇筑体温度上升幅度)提出了桩基承台大体积混凝土的温度控制要点,并结合某业务楼项目进行了应用介绍与分析,为相关工程开展大体积混凝土的温度监控提供了技术借鉴。In order to control the cracking of mass concrete of pile cap and ensure its construction quality,it is necessary to carry out effective temperature monitoring and control in the construction process.Therefore,the key points of temperature monitoring of mass concrete for pile foundation bearing platform are put forward from three aspects(pouring body,pouring body and monitoring frequency),and the key points of temperature control of mass concrete for pile foundation bearing platform are put forward from two aspects(molding temperature and pouring body temperature rise).The application is introduced and analyzed in combination with a business building project,It provides a technical reference for related projects to carry out temperature monitoring of mass concrete.
分 类 号:TU755[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.84.174