危险区域节点装配检验线设计优化  

Optimization Design of Assembly Inspection Line of Construction Monitoring in Critical Areas

在线阅读下载全文

作  者:高鹏 周琦 吴传伟 GAO Peng;ZHOU Qi;WU Chuan-wei(Shanghai Waigaoqiao Shipbuilding Co., Ltd., Shanghai 200137, China)

机构地区:[1]上海外高桥造船有限公司,上海200137

出  处:《船海工程》2022年第1期70-75,共6页Ship & Ocean Engineering

摘  要:针对危险区域节点装配检验线设计基准不同以及生产检验困难的问题,以18万t散货船危险区域节点为例,通过与生产设计相结合,对实际检验公差要求进行分析,优化装配检验线设计,经过实船建造验证该优化能够提高装配效率,缩短船坞建造周期。Aiming at the problems of different design datum and difficult production inspection of assembly line of joints in dangerous area,the dangerous area construction monitoring of the 180000 DWT bulk cargo as an example,the actual inspection tolerance requirements were analyzed combined with the production design.The design of assembly inspection line was optimized,which was verified to be able to improve the assembly efficiency and shorten the construction cycle of the dock.

关 键 词:危险区域节点 装配检验线 优化 精度控制 

分 类 号:U671.4[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象