检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:魏海 杨光 贾东辉 WEI Hai;YANG Guang;JIA Donghui(Tianjin Branch,CNOOC(China)Co.,Ltd.,Tianjin 300459,China)
机构地区:[1]中海石油(中国)有限公司天津分公司,天津300459
出 处:《中国海洋平台》2022年第1期101-104,108,共5页China offshore Platform
摘 要:分析某海洋修井机钻具与转盘中心对中偏差超限值的问题,收集平台设计、建造、运行过程中的数据并对修井机在不同井位时相关结构的变形数据进行校核,在确认导管架桩基承载力和上部组块杆件的强度仍满足要求后,提出对已发生变形的滑轨进行整体更换并重新调平的方案,经过测试确认所提方案满足修井作业的要求。The causes of the over limit deviation between the drilling tool and the center of the rotary table of the drilling tool of an offshore workover rig are analyzed. The data of platform design, construction and operation are collected, and the relevant structural deformation data of the workover rig at different well positions are checked. After strength verification and evaluation, it is confirmed that the bearing capacity of the jacket pile foundation and the strength of the upper block members still meet the requirements. The scheme of overall replacement and releveling of the deformed slide rail is put forward. After testing, it is confirmed that the proposed scheme meets the requirements of workover operation.
分 类 号:TE921[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200