检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:甘王伟 濮曦 陶劲松[3] 左剑 陈道君 柳永妍 GAN Wangwei;PU Xi;TAO Jingsong;ZUO Jian;CHEN Daojun;LIU Yongyan(State Grid Hunan Electric Power Company Limited Research Institute,Changsha 410007,China;State Grid Changsha Power Supply Company,Changsha 410015,China;School of Electrical Engineering and Automation,Wuhan University,Wuhan 430072,China)
机构地区:[1]国网湖南省电力有限公司电力科学研究院,湖南长沙410007 [2]国网湖南省电力有限公司长沙供电分公司,湖南长沙410015 [3]武汉大学电气与自动化学院,湖北武汉430072
出 处:《湖南电力》2022年第1期1-7,共7页Hunan Electric Power
基 金:国家自然科学基金项目(51777145)。
摘 要:在10 kV低压配电网中,由电磁式电压互感器铁芯饱和引起的铁磁谐振现象会严重影响电力系统的安全稳定运行。以某10 kV中性点不接地配网系统为研究对象,采用Matlab/Simulink建立铁磁谐振仿真模型,以单相短路接地故障消失作为谐振触发条件,研究系统对地电容对于谐振类型的影响。为优化Simulink仿真过程中修改元件参数时需逐一打开参数编辑界面等不足,创造性地引入Matlab图形用户界面(GUI),将参数调整、模型运行以及结果展示呈现在同一界面,在一定程度上提高了用户的使用体验。In 10 kV low-voltage distribution network,the ferroresonance phenomenon caused by the saturation of electromagnetic voltage transformer core will seriously affect the safe and stable operation of power system.In this paper,a 10 kV neutral ungrounded distribution network system is taken as the research object,and the simulation model of ferroresonance is established by using Matlab/Simulink.Taking the disappearance of single-phase short-circuit to ground fault as the resonance trigger condition,the influence of system to ground capacitance on resonance type is studied.In order to optimize the shortcomings of Simulink simulation,such as the need to open the model parameter editing interface one by one when modifying the control parameters,this paper creatively introduces the Matlab graphical user interface(GUI)to present the parameter adjustment,model operation and result display in a unified interface,which improves the user experience to a certain extent.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.252.174