检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中建二局第三建筑工程有限公司,北京100070
出 处:《建筑技术开发》2022年第4期80-82,共3页Building Technology Development
摘 要:结合天谷大楼项目,对复杂环境下局部逆作法施工技术进行研究。基坑内设置反压土来保护周边建筑物、地下管线等设施的安全及稳定,通过对周边环境、现场土质、施工临时道路、逆作法施工等特点分析,提出复杂环境下的逆作法施工技术及安全保证措施。项目采用顺逆结合的施工方案、合理设置出土坡道、选用合理的施工机具和方法来处理土质较复杂的情况,使基坑及周边建筑、地下管线等处于安全控制范围内。Combined with the Tianyu Building project, the local top-down construction technique is studied in the complex environment. Anti-compressed soil is set in the foundation pit to protect the safety and stability of the surrounding buildings, underground pipelines and other facilities. Through the characteristic analysis of the surrounding environment, site soil, temporary construction road and top-down construction, the top-down construction technology and safety guarantee measures in the complex environment are put forward. The project adopts the combination construction plan of top-down and bottom-up method, reasonable excavated ramps,reasonable construction tools and methods to deal with the complicated soil quality, and makes the foundation pit and surrounding buildings and underground pipelines within the safety control scope.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.153.154