检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:范振军 Fan Zhen-jun
机构地区:[1]中国水利水电第六工程局有限公司,沈阳110179
出 处:《建筑技术开发》2022年第4期89-92,共4页Building Technology Development
摘 要:我国公路桥梁建设规模不断扩大,公路桥梁施工的各项施工技术也得到了深入发展,其中后张法预应力张拉技术作为桥梁施工中的一项关键技术,直接影响桥梁工程的施工质量。本文结合珠海南湾大道改造工程主线桥现浇连续箱梁预应力张拉施工经验,对后张法预应力张拉施工工艺、质量控制及常见问题处理措施进行了阐述,以期与同行分享。With continuous expansion of scale of highway bridge construction in China, various construction technologies of highway bridge construction have also been deeply developed. As a key technology in bridge construction, post tensioning prestressed tensioning technology directly affects the construction quality of bridge engineering. Combined with the prestressed tensioning construction experience of cast-in-situ continuous box girder of the main bridge of Zhuhai Nanwan Avenue reconstruction project, the paper expounds the post tensioning prestressed tensioning construction technology, quality control and common problem treatment measures, in order to share with peers.
分 类 号:U445.57[建筑科学—桥梁与隧道工程] TU745.2[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.133.141.175