检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王蓓 Wang Bei(Hunan High Speed Engineering Consulting Co.,Ltd.,Changsha 410000,China)
机构地区:[1]湖南高速工程咨询有限公司,湖南长沙410000
出 处:《科学技术创新》2022年第6期94-97,共4页Scientific and Technological Innovation
摘 要:桥梁工程传统施工方案常用满堂支架工艺,进行混凝土箱梁现浇,近些年我国公路桥梁建设快速推进,满堂支架施工工艺,已无法满足不断提高的施工技术要求。钢管桩支架施工工艺具有施工速度快、施工成本低等优点。基于此,本文基于桥梁工程实例,探讨钢管桩支架施工工艺在现浇箱梁施工中的应用。The traditional construction scheme of bridge engineering commonly used full-hall bracket technology,concrete box girder cast-in-place, in recent years, with the rapid development of Highway Bridge Construction in China,the construction technology of full support can not meet the ever-increasing construction technical requirements. The construction technology of steel pipe pile support has the advantages of high construction speed and low construction cost.Based on this, this paper discusses the application of steel pipe pile bracket construction technology in cast-in-place box girder construction based on bridge engineering examples.
分 类 号:U445[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.63