检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:伍琪琳[1] 燕继宇 王征亮[1] WU Qi-lin;YAN Ji-yu;WANG Zheng-liang(CCCC-FHDI Engineering Co.,Ltd.,Guangzhou 510290,China)
机构地区:[1]中交第四航务工程勘察设计院有限公司,广东广州510290
出 处:《水运工程》2022年第2期224-228,共5页Port & Waterway Engineering
摘 要:某港口工程监测资料揭示防渗墙墙下存在渗透通道,采用墙下灌浆措施成功治理了渗漏通道。对本工程防渗墙墙下堵漏处理的设计及施工关键技术要点进行总结,囊括防渗标准、堵漏范围确定、灌浆孔平面布置、灌浆深度、灌浆分段、灌浆压力、灌浆工艺等方面,形成一套完整的防渗墙墙下堵漏处理技术。采用水位观测确定堵漏范围的方法突破了旧有技术,可为后续项目提供参考。In a port engineering project,monitoring data reveal the presence of leakage channels under the cut-off wall.Grouting under the wall has been proven highly effective against the leakage.The key technical points are summarized regarding the design and construction for the leakage treatment under the cut-off wall in the project,encompassing the anti-leakage standard,determination of the sealing range,layout of grouting holes,grouting depth,grouting sections,grouting pressure,and grouting technology.Taken together,they form a set of technology for the treatment of leakage under cut-off walls.The sealing range determination based on water level observation breaks through the traditional technology,which can provide a reference for subsequent projects.
分 类 号:U655[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.74.181