乌东德水电站导流洞进口一槽双门设计研究  

Design and research of‘one slot-two gates’in diversion tunnel inlet of Wudongde Hydropower Station

在线阅读下载全文

作  者:钱军祥 胡剑杰 QIAN Junxiang;HU Jianjie(Changjiang Survey,Planning,Design and Research Co.,Ltd.,Wuhan 430010,China)

机构地区:[1]长江勘测规划设计研究有限责任公司,湖北武汉430010

出  处:《人民长江》2022年第2期95-99,共5页Yangtze River

摘  要:为解决大型水电站导流洞运行期检修难题,优化导流洞进口布置,以乌东德水电站导流洞工程为例,从导流洞检修通道设置、检修门及其埋件布置方式等方面进行分析研究,提出了导流洞进口检修门和封堵闸门共用门槽的“一槽双门”设计方案,详细阐述了“一槽双门”的闸门和门槽布置方案、门槽型式选择和门槽主要结构设计流程。工程实际运行结果表明:“一槽双门”设计方案在满足导流洞检修及封堵的功能的同时,能大大降低施工难度、缩短施工工期、减少工程投资,该方案可供同类工程设计参考。In order to solve the maintenance problem of diversion tunnel in large hydropower station and optimize the inlet layout of diversion tunnel,taking the diversion tunnel project in Wudongde Hydropower Station as an example,we analyzed and studied the layout of maintenance channel,maintenance gate and buried parts of the diversion tunnel,and then put forward a design scheme of'one slot-two gates',i.e.a common set of gate slot shared by maintenance gate and sealing gate.The layout scheme of gate and gate slot,the selection of gate slot type and the main structural design process of gate slot were expounded in detail.The actual engineering operation results showed that the design scheme of'one slot-two gates′could not only meet the maintenance and sealing function of diversion tunnel,but also greatly reduced the construction difficulty,saved the construction period and reduced the engineering investment.This scheme can provide reference for similar project.

关 键 词:导流洞进口 一槽双门 封堵闸门 检修闸门 乌东德水电站 

分 类 号:TV34[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象