检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Fei Dai Wenjuan Guo Xuefeng Song Yang Zhang Ruijie Shi Feng Wang Wuyun Zhao
机构地区:[1]College of Mechanical and Electrical Engineering,Gansu Agricultural University,Lanzhou 730070,China [2]School of Cyber Security,Gansu University of Political Science and Law,Lanzhou 730070,China
出 处:《International Journal of Agricultural and Biological Engineering》2022年第1期139-146,共8页国际农业与生物工程学报(英文)
基 金:the National Natural Science Foundation of China(Grant No.52065005,No.51775115);Outstanding Youth Foundation of Gansu Province(Grant No.20JR10RA560);Natural Science Foundation of Gansu Province(Grant No.20JR5RA029);Research Program Sponsored by Gansu Provincial Key Laboratory of Aridland Crop Science,Gansu Agricultural University(Grant No.GSCS-2020-01).
摘 要:In order to further improve the working performance and efficiency of mechanized tillage operation of a full-film double-ditch seedbed,under the working conditions of different parameters of the spiral push-type soil covering device with double-width filming,the dynamic soil covering characteristics and soil covering uniformity of the device were analyzed,the collaborative and interactive coupling mechanism of the horizontal pushing process of the mulching soil and horizontally two-way spiral soil transmission device were revealed,and the main reasons for the influence of different soil covering belts on the change of soil particle number distribution were analyzed.Based on the full-film double-ditch mode with double-width filming,the mechanized soil covering path was optimized.In order to further reduce the disturbance on mulching soil by two-way spiral pushing,a kind of parallel shunt type soil covering device with double-width filming was designed,then a discrete element method was adopted to make simulation analysis and optimize the parallel shunt type soil covering device with double-width filming.Field verification tests showed that after the operation of the full-film double-ditch combined machine with double-width filming and soil covering installed with the parallel shunt type soil covering device,the qualified rate of the film edge soil covering width was 96.1%,an increase of 1.6%compared to that before optimization;the qualified rate of soil covering width at the center of the big ridge was 93.5%,an increase of 1.9%compared to that before optimization;the qualified rate of the soil covering thickness was 97.7%,an increase of 0.2%compared to that before optimization.The test indicators reached the requirements of relevant national and industrial standards,showing that the test results met the design requirements,and the working conditions of verification tests were consistent with the simulation results.
关 键 词:full-film double-ditch double-width filming soil covering soil covering path optimization soil covering device
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.190.152.131