氨法脱硫中脱硫塔设计技术要点分析  被引量:1

Analysis of Key Technical Points in the Desulfurization Column Design of the Ammonia Desulfurization Process

在线阅读下载全文

作  者:余召霞 YU Zhao-xia(Jiangsu Deyitong Environmental Protection Technology Co.,Ltd.,Nanjing Jiangsu 210031,China)

机构地区:[1]江苏德义通环保科技有限公司,江苏南京210031

出  处:《化肥设计》2022年第1期25-27,共3页Chemical Fertilizer Design

摘  要:脱硫塔是氨法脱硫中的核心设备,塔体设备高大且其内件结构层繁多,在设计中存在许多重点及难点。采用底板与基础型钢焊接并开设塞焊孔形式,保证设备与基础安装;喷淋层的布置及各支撑梁的合理设计是保证脱硫塔安全有效运行的前提。As a core equipment in the ammonia desulfurization process,The Desulfurization Column is tall and with multi-layered internals,presenting a lot of key points and difficulties in design.Its base plate is welded on foundation profile steel with plug welding holes,to ensure the installation of the column on the foundation.Arrangement of the spray layer and reasonable design of all support beams are the preconditions to ensure the safe and effective operation of the Desulfurization Column.

关 键 词:氨法脱硫 底板 防腐 支撑梁 喷淋层 内件 

分 类 号:X701.3[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象