检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Yongping Yu Lihui Chen JuanjuanWang Guoji Liu
机构地区:[1]College of Construction Engineering,Jilin University,Changchun,130021,China [2]College of Physics,Jilin University,Changchun,130012,China
出 处:《Computer Modeling in Engineering & Sciences》2020年第11期647-670,共24页工程与科学中的计算机建模(英文)
基 金:This work is supported by the National Natural Science Foundation of China(Grant Nos.41972323 and 51991362);Science and Technology Project of the 13th Five-Year Plan of Jilin Provincial Department of Education(Grant No.JJKH20190126KJ);the Science and Technology Developing Plan Project of Jilin Province(Grant No.20200201055JC).
摘 要:The tower line system will be in an unsafe status due to uniform or uneven fall of ice coating which is attached to the surface of tower and lines.The fall of ice could be caused by wind action or thermal force.In order to study the dynamic characteristics of the self-failure of the transmission line under the action of dynamicwind load,a finite elementmodel of the two-span transmission tower line system was established.The birth and death element methods are used to simulate the icing and shedding of the line.Tensile failure strength is the shedding criterion for ice coating.The fluctuating wind speed time history of the tower line systemis first simulated,and then the fluctuating wind and the average wind are superimposed to generate the instantaneous wind speed and converted into wind load.The dynamic response of the transmission tower line systemunder iced coupling with different wind speeds and different thicknesses of ice coating was studied.This is the first attempt that the coupling dynamic response of the icing shedding and wind load for the transmission tower-line system is discussed in this paper.In addition,the dynamic characteristics of wind are included.In particular,the limiting mechanical conditions are considered.According to the simulation results,it is found:because of the ice shedding,the stress of the conductor changes obviously in the first 20 seconds,and the ground wire changes sharply in the first two seconds;the icing of the conductor(ground)wire is gradually deicing under the action of wind vibration;the displacement of tower top increases with the increase of wind speed and icing thickness.
关 键 词:Tower line system fluctuating wind ice shedding dynamic response wind-induced ice shedding
分 类 号:TG1[金属学及工艺—金属学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222