检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐华 胡双锋[1] 付秀娟[1] 胡小艳 Xu Hua;Hu Shuangfeng;Fu Xiujuan;Hu Xiaoyan(School of Material Science and Engineering,Wuhan Institute of Technology,Anhui Bestforging Technology Co.,Ltd.,Wuhan 430205,China;Wuhan Huichuang Precision Machinery Manufacturing Co.,Ltd.,Wuhan 430205,China)
机构地区:[1]武汉工程大学材料科学与工程学院,湖北武汉430205 [2]安徽博斯特科技有限公司,安徽芜湖241100 [3]武汉汇创精密机械制造有限公司,湖北武汉430205
出 处:《锻压技术》2022年第1期161-167,共7页Forging & Stamping Technology
基 金:国家自然科学基金资助项目(51575406);武汉工程大学科学研究基金项目(K201804)。
摘 要:在分析了42CrMo钢三缸曲轴结构特征的基础上,采用Deform软件,优化了预锻件敷料结构,敷料轮廓由直线相交转变为圆弧过渡,并将夹角由15°优化为20°,降低了模膛应力值;设计了便于变形、分模以及后续配重的余块结构,并在预锻模边缘设计了半开半闭式挤压筒结构,分配了预、终锻变形量,得到了预、终锻模具结构。利用Deform-3D对预、终锻成形过程进行了数值模拟,预锻件飞边为15~55 mm,终锻件飞边为35~65 mm,预、终锻件飞边的实测值比模拟结果大5 mm,锻件预锻温度设计为1200℃,终锻结束时温度高于900℃。生产实践表明:模拟结果可以辅助锻模结构设计,锻件飞边均匀、模膛填充饱满,终锻件符合图样技术要求,满足验收标准。Based on the analysis of structural characteristics for three-cylinder crankshaft of 42 CrMo steel, the dressing structure of pre-forgings was optimized by software Deform, the dressing contour was changed from the straight line intersection to the arc transition, and the intersection angle was optimized from 15° to 20° to reduce the stress value of die cavity. Furthermore, the remaining block structure was designed in order to facilitate deformation, mold splitting and subsequent counterweights, the semi-open and semi-closed extrusion barrel structure was designed at the edge of pre-forging die, the pre-forging and final forging deformation amounts were distributed, and the pre-forging and final forging die structures were obtained. Finally, the forming processes of pre-forging and final forging were numerical simulated by Deform-3 D respectively, and the flash values of pre-forgings and final forgings were 15-55 mm and 35-65 mm respectively, which was 5 mm smaller than the measured values. In addition, the pre-forging temperature of forgings was designed to be 1200 ℃, and the temperature at the end of final forging was over 900°. The production practice shows that the simulation results can assist the structural design of the forging die, the flash of forgings is uniform, the die cavity is filled fully, and the final forgings meet the technical requirements of drawing and acceptance criteria.
分 类 号:TG316[金属学及工艺—金属压力加工]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.14.145.78