盾构渣土资源化处理工艺及成套系统装备研究  被引量:8

Treatment Process and a Complete Set of Equipment for Resource Utilization of Waste Soil in Shield Tunneling

在线阅读下载全文

作  者:刘恒 孙晓辉 牟松 周学彬 李恒 陈湘生[2,3] LIU Heng;SUN Xiaohui;MU Song;ZHOU Xuebin;LI Heng;CHEN Xiangsheng(China Railway Southern Investment Group Co.,Ltd.,Shenzhen 518054,Guangdong,China;Shenzhen University,Shenzhen 518000,Guangdong,China;Shenzhen Key Laboratory of Green,Efficient,and Intelligent Construction of Underground Metro Station,Shenzhen 518000,Guangdong,China;China Railway Engineering Service Co.,Ltd.,Chengdu 610083,Sichuan,China)

机构地区:[1]中铁南方投资集团有限公司,广东深圳518054 [2]深圳大学,广东深圳518000 [3]深圳市地铁地下车站绿色高效智能建造重点实验室,广东深圳518000 [4]中铁工程服务有限公司,四川成都610083

出  处:《隧道建设(中英文)》2022年第2期320-327,共8页Tunnel Construction

基  金:国家自然科学基金面上项目(52179108);国家自然科学基金重点项目(51938008);中铁南方投资集团有限公司立项课题(ZTNF-2020-02)。

摘  要:为解决当前盾构渣土资源化装备庞大、操作复杂、对不同类型渣土及狭小场地适应性差等问题,以深圳地铁14号线六约北站盾构隧道工程为背景,研究盾构渣土资源化处理工艺以及智能化、集成化、模块化的振动筛分、絮凝、压滤、管路和中央集中控制平台等成套系统装备,并在六约北站盾构渣土资源化处理工程中得到了成功应用。结果表明:六约北站采用新装备和新工艺后,设备占地面积仅470 m^(2),最大处理能力达到1 400 m^(3)/d,仅需4人即可维持整个装备系统的有效运行;设备系统对不同地层渣土的适应性大幅提高,筛孔淤堵得到解决;所生产的粗骨料、细骨料含泥量和含水率大幅降低。由此可见,盾构渣土资源化处理系统的智能化、集成化、模块化提升是装备升级的发展方向,最终形成智能化、集装箱化成套装备,从而满足不同场地及周边环境的运行需求。The resource utilization of waste soil in shield tunneling has numerous disadvantages, including a large scale of equipment, complicated operation, and poor adaptability to different soils and small areas. In this study, the treatment process for the resource utilization and an intelligent, integrated, and modularized equipment of vibration screening,flocculation, pressure filtration, pipeline, and centralized control platform are investigated on the basis of a shield tunnel project of Liuyue North station of Shenzhen metro line 14. The results indicate the following:(1) The equipment used in the Liuyue North station occupies only 470 m^(2), the processing capacity reaches 1 400 m^(3)per day, and only four operators are needed.(2) The adaptability of the equipment to different strata is significantly improved, and the screen clogging issue is resolved.(3) The mud and water contents of coarse aggregate/fine sand are significantly reduced. The treatment system for the resource usage of waste soil in shield tunneling is evolving toward intelligence, integration, and modularization, which is appropriate for various scenarios.

关 键 词:盾构渣土 资源化 智能化 集成化 模块化 处理工艺 处理设备 

分 类 号:U45[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象