检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴晟 程亮 赵李源 WU Sheng;CHENG Liang;ZHAO Li-yuan(Central Southern China Electric Power Design Institute Co.,Ltd.of CPECC,Wuhan 430071,Chian)
机构地区:[1]中国电力工程顾问集团中南电力设计院有限公司,湖北武汉430071
出 处:《电力勘测设计》2022年第2期12-16,共5页Electric Power Survey & Design
摘 要:柳北换流站阀厅为大跨度结构,阀厅结构采用矩形格构式钢柱支撑大跨度网架屋盖,网架屋盖的支撑条件及结构模拟对计算结构有较大的影响。对网架的平板支座方案和球铰支座方案进行比较分析,球铰支座方案相比于平板支座方案能减小支座的水平刚度,降低网架传给下部结构的水平力,提高整体结构的抗震性能。Liubei converter station valve hall is a large span structure,the large span steel grid roof is supported by rectangular lattice steel column,the supporting conditions of the steel grid roof have a great influence on the calculation results.The comparison and analysis of flat steel bearing scheme and slip spheric bearing scheme shows the slip spheric bearing scheme can reduce horizontal stiffness of the support and the horizontal force transmitted from the grid to the substructure,improve the seismic performance of the structure.
分 类 号:TM72[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195