检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:连宇顺 张斌 郑金海[1,2] 刘海笑[3] 马刚 LIAN Yushun;ZHANG Bin;ZHENG Jinhai;LIU Haixiao;MA Gang(Key Laboratory of Ministry of Education for Coastal Disaster and Protection,Hohai University,Nanjing 210098,China;College of Harbour,Coastal and Offshore Engineering,Hohai University,Nanjing 210098,China;State Key Laboratory of Hydraulic Engineering Simulation and Safety,Tianjin University,Tianjin 300072,China;Yantai Research Institute and Graduate School,Harbin Engineering University,Yantai 265501,China)
机构地区:[1]河海大学海岸灾害及防护教育部重点实验室,江苏南京210098 [2]河海大学港口海岸与近海工程学院,江苏南京210098 [3]天津大学水利工程仿真与安全国家重点实验室,天津300072 [4]哈尔滨工程大学烟台研究院,山东烟台265501
出 处:《中国舰船研究》2022年第1期80-90,116,共12页Chinese Journal of Ship Research
基 金:国家自然科学基金(51609079,51979050);中央高校基本科研业务费专项资金项目(B200201002);江苏省自然科学基金面上项目(BK20201314);天津大学水利工程仿真与安全国家重点实验室开放基金(HESS-1910)。
摘 要:[目的]为了设计造价合理、性能高效的系泊系统,研究不同系泊系统对波能发电装置(WEC)的能量摄取(PTO)能力和定位性能的影响。[方法]选择一典型的两刚体点吸式WEC装置为研究对象,采用WECSim和MoorDyn开源代码设计两类系泊系统,一类采用锚链,另一类采用锚链和聚酯缆绳所组成的混合缆。通过对这两类系泊系统进行时域分析计算,获得WEC位移响应以及PTO装置响应和系缆张力响应。[结果]结果表明:系泊系统对浮子位移响应的影响很小,但对Spar式底板的影响明显;对于针对线性阻尼型WEC,系泊系统对PTO响应的影响可以忽略不计;在工作海况下,混合缆系泊系统的张力比锚链系泊系统中同一位置处的更低。[结论]该研究可为波能发电装置的系泊设计提供参考。[Objectives]Aiming at a mooring system design with cost-effectiveness and high performance for wave energy converter(WEC),the effects of such systems on the capability of power take-off(PTO)system and positioning performance of WEC are investigated.[Methods]A two-body floating point absorber is chosen as the sample WEC.The open-source WEC-Sim and MoorDyn codes are used to design two types of mooring system for the WEC:one is a chain mooring system and the other is an integrated chain-rope(i.e.,polyester fiber rope)mooring system.By performing time-domain analysis for the WEC with different mooring lines,the responses,such as WEC displacement,power take-off(PTO)and mooring line tension,are obtained respectively.[Results]The results show that,the effects of mooring systems on the displacement response of the floater are small,but these effects on the response of the spar body is obvious.For the WEC with a linear damper,these effects on the PTO response are negligible.Moreover,the line tensions of the integrated mooring system are lower than the corresponding tensions of the chain mooring system under the operational sea state.[Conclusions]The results of this study have reference value for the improved design of WEC mooring systems.
关 键 词:聚酯缆绳 波能发电装置模拟器(WEC-Sim) MoorDyn 波能发电装置 系泊系统
分 类 号:U653.2[交通运输工程—港口、海岸及近海工程] U661.1[交通运输工程—船舶与海洋工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.192