丙烯塔塔压过高的工艺优化调整探究  

Study on Process Optimization Adjustment Aiming at Excessive Operating Pressure in Acrylic Tower

在线阅读下载全文

作  者:陈睿 CHEN Rui(Zhongan United Coal Chemical Co.,Ltd.,Huanan Anhui 232001,China)

机构地区:[1]中安联合煤化有限责任公司,安徽淮南232001

出  处:《辽宁化工》2022年第2期216-219,共4页Liaoning Chemical Industry

摘  要:丙烯精馏塔的工艺优化一直是烯烃分离中备受关注的问题,而塔压过高是影响丙烯精馏塔的主要因素。通过引入热泵技术,经过合理计算、优化操作,对丙烯塔冷却系统进行了工艺调整,有效降低了丙烯塔塔压,使塔压下降至1.856 MPa,丙烯中丙烷的质量分数稳定在0.40%以下。实现了装置满负荷生产、节能降耗的目标。The process optimization of acrylic distillation tower has always been a concern in the separation of olefins,and the excessive pressure of the tower is the main factor affecting the acrylic distillation tower.In this paper,through the introduction of heat pump technology,after reasonable calculation and optimization operation,the process adjustment of the acrylic tower cooling system was carried out,effectively reducing the pressure of the acrylic tower,so that the pressure of the tower could drop to 1.856 MPa,the mass fraction of propane in propylene was stable at less than 0.40%,the goal of full load production,energy saving and consumption reduction of the unit was realized.

关 键 词:丙烯精馏塔 塔压 热泵 优化操作 冷凝 

分 类 号:TQ221[化学工程—有机化工]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象