检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:东国忠 王小燕 马小平 DONG Guozhong;WANG Xiaoyan;MA Xiaoping(Economic and Technical Research Institute of State Grid Qinghai Electric Power Company,Xining,Qinghai 810008,China)
机构地区:[1]国网青海省电力公司经济技术研究院,青海西宁810008
出 处:《山西电力》2022年第1期7-10,共4页Shanxi Electric Power
摘 要:基于黄南南部网架薄弱,短路电流过小导致电容器分组容量配置选择困难的问题,从电压波动、涌流倍数和谐振3个方面校验了2×3000 kvar、3×2000 kvar分组方式的可行性,并从经济角度提出了改变运行方式解决电压波动较高问题的建议。In order to deal with the problem of weak grid and selection difficulty of capacitor grouping capacity configuration caused by low short-circuit current in the southern part of Huangnan Zhou,the feasibility of 2×3000 kvar,3×2000 kvar grouping methods is verified from three aspects of voltage fluctuation,inrush current multiple and resonance.And suggestions to solve the problem of high voltage fluctuation by changing the operation mode are put forward from the perspective of economy.
分 类 号:TM712[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40