作 者:刘鹏 LIU Peng(Hunan Nonferrous Metals Huangshaping Mining Co.,Ltd.,Chenzhou 414421,China)
机构地区:[1]湖南有色黄沙坪矿业有限公司,湖南郴州414421
出 处:《湖南有色金属》2022年第1期4-7,共4页Hunan Nonferrous Metals
摘 要:为了消除采空区危害且安全回采矿石,黄沙坪矿采用嗣后全尾砂胶结充填采空区。但由于嗣后尾砂充填采空区面积大、高度高,充填采场内料浆因离析而存在动水压力和静水压力,使得合理计算充填挡墙受力较为困难。文章以黄沙坪矿山为研究背景,研究了尾砂充填条件下充填挡墙压力变化规律,确定了适合嗣后充填挡墙侧压力计算公式。基于黄沙坪矿业嗣后充填采空区参数,结合抗压、抗剪、抗渗透3种计算方式,综合确定嗣后尾砂充填挡墙厚度为0.3m,为类似嗣后充填矿山挡墙设计提供了参考依据。In order to eliminate the harm of goaf and safely mine ore, a mine uses subsequent full tailings cementation to fill the goaf.However, due to the large area and high height of the goaf filled with tailings, the slurry in the filling stope has hydrodynamic pressure and hydrostatic pressure due to segregation, which makes it difficult to reasonably calculate the stress of the filling retaining wall.Taking the Huangsha mine as the research background, this paper studies the variation law of filling retaining wall pressure under the condition of tailings filling, and determines the calculation formula of lateral pressure suitable for subsequent filling retaining wall.Combined with the three calculation methods of compression, shear and permeability resistance, the thickness of subsequent tailings filling retaining wall is determined to be 0.3 m, which provides a reference for the design of subsequent filling mine retaining wall.
关 键 词:嗣后尾砂充填 充填挡墙 挡墙厚度 挡墙压力 倾斜面
分 类 号:TD853.391[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200