检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张红 ZHANG Hong(Shanxi Jinmei Tisco Energy Co.LTD,Lvliang 033207,China)
机构地区:[1]山西晋煤太钢能源有限责任公司,山西吕梁033207
出 处:《煤矿现代化》2022年第2期101-103,107,共4页Coal Mine Modernization
摘 要:赵庄二号2309综放工作面内地质构造异常带大量发育,导致工作面煤岩体结构破碎,对工作面的顶板管理及瓦斯治理带来困难,威胁工作面的回采安全。为解决这一问题,针对2309综放工作面地质构造异常区域采取注浆加固措施,并对各加固区分别进行注浆加固方案设计,并对注浆加固效果进行监测分析,科学合理地解决工作面过地质构造异常带的安全问题,为工作面的安全生产提供保障。Zhaozhuang No.22309 fully mechanized caving face geologic al structure abnormal zone developed in large quantities,resulting in the coal and rock structure of the working face broken,the working face roof management and gas control brought difficulties,threatening the mining safety of the working face.To solve this problem,in view of the geological structure of full-mechanized caving mining face 2309 abnormal region by grouting reinforcement measures,and the grouting reinforcement scheme design with the reinforced area respectively,and the reinforcement effect of the grouting monitoring analysis,scientific and reasonable to solve the problem of face of tectonic migration of safety,provide safeguard for safety production of working face.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229