检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄贤锋 HUANG Xianfeng(Shandong Yankuang Design Consulting Co.,Ltd,Zoucheng 273500,China)
机构地区:[1]山东兖矿设计咨询有限公司,山东邹城273500
出 处:《煤矿现代化》2022年第2期104-107,共4页Coal Mine Modernization
摘 要:根据运河煤矿生产接续规划,未来矿井生产布局及生产系统将发生较大调整,届时将直接导致矿井实际需要风量增大,为保证矿井均衡稳定生产,现主要通风机供风能力将不能满足矿井未来生产需求。通过方案比选,提出采用更换目前主要通风机的方式,解决井下风量不足问题,从而保证矿井通风系统稳定和安全生产。According to the production continuity planning of Yunhe Coal Mine,the production layout and production system of the mine will be greatly adjusted in the future,which will directly lead to the increase of the actual air volume required by the mine.In order to ensure the balanced and stable production of the mine,the air supply capacity of the main ventilator will not be able to meet the future production demand of the mine.Therefore,this paper,through scheme comparison and selection,proposes to replace the current main ventilator to solve the problem of underground air shortage,so as to ensure the stability of mine ventilation system and safe production.
分 类 号:TD724[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.146.235