检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:庄玉灿 Zhuang Yucan(Xiamen Haitou Engineering Construction Co.Ltd.,Xiamen,Fujian 361026)
机构地区:[1]厦门海投工程建设有限公司,福建厦门361026
出 处:《江西建材》2022年第2期174-176,共3页Jiangxi Building Materials
摘 要:随着我国经济快速发展,国家大型房建工程、道路等房屋及基础设施的快速发展,钻孔灌注桩被广泛地应用于工程中,但灌注桩对多余超灌这部分混凝土,应当在基础承台等下一道工序施工前凿除,并确保凿除后桩头混凝土密实不松散,同时在凿除过程中要做到文明施工和环境保护,为此寻求一种方便、迅速、节约、环保移除桩头超灌混凝土作业技术就极为重要。文中结合工程实际,分析了桩基预留钢筋保护套整体移除桩头施工技术的适用范围、技术特点、工艺原理。提出了施工质量安全与文明环保控制措施。With the rapid development of my country's economy and the rapid development of large-scale housing construction projects,roads and other housing and infrastructure,bored piles have been widely used in engineering,but the piles have overfilled the excess concrete.It should be removed before the next step of construction such as the foundation cap,and ensure that the pile head concrete is not loose and dense after removal.At the same time,civilized construction and environmental protection should be done during the removal process.For this purpose,a convenient and rapid method should be sought,Saving and environmental protection The technology of removing pile head overfilled concrete is extremely important.Combined with the engineering practice,this paper analyzes the application scope,technical characteristics and process principle of the construction technology of integral removal of pile head with reserved reinforcement protective sleeve of pile foundation.The control measures of construction quality,safety,civilization and environmental protection are put forward.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222