检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:成建强[1] 唐龙龙 Cheng Jianqiang;Tang Longlong(CCCC First Harbor Consultants Co.,Ltd.,Tianjin 300220,China)
机构地区:[1]中交第一航务工程勘察设计院有限公司,天津300220
出 处:《港工技术》2022年第1期95-98,共4页Port Engineering Technology
摘 要:本文以某生产污水处理站桩基施工过程中及施工完成后桩基发生偏位为例,通过研究分析工程概况、工程地质情况、施工过程以及检测结果,着重对软土地基PHC管桩偏位的原因进行分析,并给出避免类似问题的建议。对类似工程施工有一定借鉴意义。As for the deviation phenomenon of pile foundation during and after the construction of a production sewage treatment station, research and analysis are carried out for the project in general, geological conditions, the construction process and testing results, especially the causes for the deviation of PHC pipe pile driven in soft soil foundation. Some suggestions to avoid similar problems are proposed, which may serve as a reference for the construction of similar projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33