检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邓安定 Deng An-ding(Shanghai Construction Investment Co.,Ltd.,China Railway 24th Bureau Group,Shanghai 200040,China)
机构地区:[1]中铁二十四局集团上海建设投资有限公司,上海200040
出 处:《建筑与装饰》2022年第4期184-186,共3页Construction & Decoration
摘 要:地下室抗浮设计作为高地下水位地区结构设计的重难点之一,其抗浮设计做法包括抗拔桩、抗浮锚杆、增加配重等形式。其中,抗浮锚杆设计在经济性和施工便捷性方面具有突出优势。本文从抗浮锚杆节点防水做法入手,对其施工工艺和质量控制措施等进行了论述。同时,通过借助实际工程案例,对其抗浮锚杆设计、节点防水做法、施工关键环节等进行了深入探讨。Basement anti-floating design is one of the most difficult problems in structural design in areas with high groundwater levels.Its anti-floating design practices include anti-uplift piles,anti-floating anchors,and increased counterweights.Among them,the anti-floating anchor design has outstanding advantages in terms of economy and construction convenience.This paper starts with the waterproof method of anti-floating anchor nodes and discusses its construction technology and quality control measures.At the same time,with the help of actual engineering cases,the design of anti-floating anchors,node waterproofing methods,and key construction links are discussed in depth.
分 类 号:TU7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.142.219.125