检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马茹悦 刘苗苗 李怀祥 汪正祥[1] MA Ruyue;LIU Miaomiao;LI Huaixiang;WANG Zhengxiang(Faculty of Resources and Environmental Science,Hubei University,Wuhan 430062,China)
出 处:《林业调查规划》2022年第1期44-49,共6页Forest Inventory and Planning
摘 要:引江补汉工程以输水隧道的形式穿越湖北五道峡国家级自然保护区等多个生态敏感区。结合自然保护区的生物多样性现状以及输水隧道工程的特点,建立生物多样性评价指标体系,指标体系包括一级指标6个,二级指标26个,通过向专家咨询确定各指标权重并进行赋值,计算生物多样性影响指数(BI)。结果表明,引江补汉输水隧道建设工程对湖北五道峡国家级自然保护区的生物多样性影响指数为51.32,属于中低度影响等级。The water conveyance tunnel of the diversion project from the Three Gorges Reservoir to the Hanjiang River crosses several ecologically sensitive areas such as Wudaoxia National Nature Reserve in Hubei Province.This paper established the biodiversity evaluation index system which included 6 primary indexes and 26 secondary indexes based on the current situation of biodiversity in nature reserve and the characteristics of water conveyance tunnel project,determined the weight of each index by consulting experts,and calculated the biodiversity impact index(BI).The results showed that the biodiversity impact index of the project on Wudaoxia National Nature Reserve was 51.32,which belonged to the medium and low level.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15