检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:岳芃喜[1] 蔺文乐 YUE Pengxi;LIN Wenle(Jinan West Locomotive Depot,Jinan 250117,China;Safety Inspection Office of China Railway Jinan Group Co.,Ltd.,Jinan 250001,China)
机构地区:[1]济南西机务段,山东济南250117 [2]中国铁路济南局集团有限公司安监室,山东济南250001
出 处:《铁道机车与动车》2022年第1期37-39,46,I0002,共5页Railway Locomotive and Motor Car
摘 要:通过对HX_(N)3B型内燃机车空压机卸荷阀控制原理介绍,结合在调车作业过程中出现的空压机1停机故障进行分析处理,总结卸荷阀控制电路故障发生的原因,找出机车辅助逆变器内控程序设计缺陷,有针对性地提出控制软件升级建议,及时对内控程序进行版本升级,对确保编组站调车作业秩序具有积极的作用。Based on the control principle of the unload valve of HX_(N)3B diesel locomotive air compressor and combined with the analysis and treatment of the air compressor 1 shutdown occurred during the shunting service,the causes of the unload valve control circuit failure were summarized,and the design flaws of internal control program of locomotive auxiliary inverter were found.So we put forward the suggestions of upgrading control software in a targeted manner,and updated software version timely,which has a positive effect on ensuring the order of shunting service at the marshalling yard.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28