检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王利平[1] 程浪 胡杨 WANG Liping;CHENG Lang;HU Yang(State Grid Sichuan Electric Power Company,Chengdu 610041,Sichuan,China;State Grid Sichuan Maintenance Company,Chengdu 610041,Sichuan,China)
机构地区:[1]国网四川省电力公司,四川成都610041 [2]国网四川省电力公司检修公司,四川成都610041
出 处:《四川电力技术》2022年第1期40-44,86,共6页Sichuan Electric Power Technology
摘 要:文中对电流互感器(CT)在不同安装位置发生位于断路器与CT之间的故障进行了保护的动作行为分析。同时分析了死区故障时,断路器失灵保护和死区保护的动作逻辑,梳理了四川电网220 kV以上断路器CT安装位置的现状,并提出为了保障系统稳定应严格按照反事故措施要求将CT在断路器两侧布置的建议。The action behavior of the protection is analyzed when current transformer(CT)is installed in different positions in case that the fault point is between the circuit breaker and the CT.If the action behavior could not remove the fault reliably,the range of outage would be extended.At the same time,in the case of a dead-zone fault,the action logics of the failure protection of circuit breaker and the dead-zone protection are analyzed.The current situation of the installation locations of CT of 220 kV circuit breaker and above in Sichuan power grid is summarized,and based on the existing researches,the suggestions are proposed that the CT should be arranged on both sides of circuit breaker strictly in accordance with the requirements of anti-accident measures.
分 类 号:TM774[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.58.73.22