检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:付云鹏 Fu Yunpeng(Lingyuan water conservancy project management station,Lingyuan City,Chaoyang 122500,Liaoning)
机构地区:[1]凌源市水利工程管理站,辽宁省朝阳市凌源市122500
出 处:《吉林水利》2022年第2期59-62,共4页Jilin Water Resources
摘 要:消力池的结构优化设计有助于提高消能效果,保证泄水建筑物的安全稳定运行,具有重要的工程意义和价值。文章以辽宁省凌源市何家沟水库除险加固工程为例,利用数值模拟的方式,探讨了消能墩墩型和位置对消能效果的影响。综合模拟计算结果,建议工程设计中在消力池的池尾设置T型消能墩。The structural optimization design of stilling basin is helpful to improve the energy dissipation effect and ensure the safe and stable operation of discharge structures,which has important engineering significance and value.Taking the danger removal and reinforcement project of the Hejiagou Reservoir in Lingyuan,Liaoning,as an example,this paper discusses the influence of energy dissipation pier type and location on energy dissipation effect by means of numerical simulation.Based on the simulation results,it is suggested to set T-shaped energy dissipation pier at the end of the stilling basin in the engineering design.
分 类 号:TV653.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.46