检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:叶平先 汲生伟 YE Pingxian;JI Shengwei(Jinchengxin Mine Design Institute Co.,Ltd.;Aerospace Architecture Design and Research Institute Co.,Ltd.)
机构地区:[1]金诚信矿山设计院有限公司,北京市100070 [2]航天建筑设计研究院有限公司
出 处:《现代矿业》2022年第2期137-139,184,共4页Modern Mining
摘 要:为了解千米超深井大体积混凝土止浆垫施工期间的温度场变化情况,采用有限元分析软件Midas/Gen对其进行仿真分析。计算中考虑了水泥水化热、掺合料、周围环境、入模温度、水冷等因素的影响。结果表明,模拟所得到的温度场数据和实测数据基本吻合,模拟结果对实际工程具有参考价值。结合模拟结果,施工组织者应针对各项问题,选择合理的施工方案和应对措施,以保证工程质量。In order to understand the temperature field changes during the construction of the mass concrete slurry blocking pad in the kilometer ultra-deep well,the finite element analysis software Midas/Gen is used to simulate and analyze it.In the calculation,the influence of factors such as cement hydration heat,admixtures,surrounding environment,mold entry temperature,and water cooling are considered.The results show that the temperature field data obtained by the simulation are basically consistent with the measured data,and the simulation results have reference value for practical engineering.Combined with the simulation results,the construction organizer should select reasonable construction plans and countermeasures for various problems to ensure the quality of the project.
分 类 号:TD745[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.141.157