检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王海建 马晓攀 WANG Haijian;MA Xiaopan(China Water Resources Pearl River Planning Surveying & Designing Co.,Ltd.,Guangzhou 510610,China)
机构地区:[1]中水珠江规划勘测设计有限公司,广州510610
出 处:《广东水利水电》2022年第3期26-31,共6页Guangdong Water Resources and Hydropower
摘 要:某电站尾水渠边坡在暴雨及洪水冲刷过后局部发生较大变形,在水下施工对其进行加固难度较大,首先采用水下摄像及量测查明变形幅度,然后结合数值模拟计算,对边坡变形原因进行了分析研究,根据分析结果和方案比选,采取了水下封堵灌浆、锚筋桩及排水等综合措施加固边坡。加固施工不影响电站运行,取得了较好的效果,可为类似工程提供参考。After the heavy rain and flood,the slope of the power station tailrace has a large sliding deformation,and it is difficult to reinforce it under water.According to the result of underwater detection and numerical value simulation,the reason of slope sliding is analyzed and studied.Based on the results of the analysis and plan comparison,using the comprehensive reinforcement measures of underwater grouting and the anchor bolt and drainage to reinforce the slop.The reinforcement construction did not affect the operation of the power station and achieved good results.This method can be a reference for similar projects.
分 类 号:TV22[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7