检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张水华 张艳 梁栋才 ZHANG Shuihua;ZHANG Yan;LIANG Dongcai(Third Engineering Company of Yunnan Jiaotong Highuay Construction Co.,Ltd.,Kunming,Yunnan 650103,China;Kunming East Management Office,Yunnan Communications Imwestment&Construction Group Co.,Ltd.,Kunming,Yunnan 650000,China;State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rocke and Soil Mechanics,Chinese Academy of Sciences,Wuhan,Hubei 430071,China;University of Chinese Academy of Sciences,Beijing 100049,China)
机构地区:[1]云南交投公路建设第三工程有限公司,云南昆明650103 [2]云南省交通投资建设集团有限公司昆明东管理处,云南昆明650000 [3]中国科学院武汉岩土力学研究所岩土力学与工程国家重点实验室,湖北武汉430071 [4]中国科学院大学,北京100049
出 处:《水利与建筑工程学报》2022年第1期19-25,42,共8页Journal of Water Resources and Architectural Engineering
基 金:降雨和工程扰动诱发风化混合花岗岩边坡失稳力学机制和灾害调控技术研究(云交科教[2018]45号)。
摘 要:为了研究含顺倾节理岩质边坡的破坏过程,以某露天矿西南区域边坡为研究对象,建立典型剖面的数值模型,并通过室内试验标定边坡数值模型细观参数,监测数值边坡模型关键位置的速度、位移和孔隙率,结合边坡内部的裂纹发育和力链分布情况,分析边坡的破坏过程特征。结果表明:基于离散元的数值模拟试验和边坡数值模型均符合实际情况,具有可行性;边坡的破坏过程是在剪切应力和拉应力作用下,顺倾节理处的力链由下至上逐渐断裂,随着断裂范围扩大,边坡发生加速滑动,具体表现为受顺倾节理控制的前缘牵引式剪切-张拉组合破坏;节理上部的“拱形”力链未被破坏,滑坡特征为沿节理面和岩桥的整体滑动。In order to analyze the inclination joints failure process of rock slope,a slope of an open-pit mine was taken as an example. The numerical model of a typical profile was developed. The mesoscopic parameters of slope numerical model were calibrated by laboratory tests. The velocity,displacement,porosity,internal crack development and force chain distribution at key positions of numerical slope model are analyzed,and the failure process characteristics of slope are obtained. The results show that The numerical simulation test and slope numerical model based on discrete element method are feasible and accord with the actual situation. The failure process of the slope is as follows. Under the action of shear stress and tensile stress,the force chain at the inclined joint gradually breaks from bottom to top. With the expansion of the failure range,the slope accelerates sliding,which is characterized by the front traction shear-tension combination failure controlled by the inclination joint. The “arch”force chain at the upper part of the joint is not destroyed,and the landslide is characterized by integral sliding along the joint plane and rock bridge.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.252.197