检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:唐雄俊[1,2] TANG Xiongjun(China Railway Siyuan Survey and Design Group Co.,Ltd.,Wuhan 430063,Hubei,China;Natinal&Local Joint Engineering Research Center of Underwater Tunneling Technology,Wuhan 430063,Hubei,China)
机构地区:[1]中铁第四勘察设计院集团有限公司,湖北武汉430063 [2]水下隧道技术国家地方联合工程研究中心,湖北武汉430063
出 处:《隧道建设(中英文)》2021年第S02期190-198,共9页Tunnel Construction
摘 要:为确保隧道稳定、节约成本,针对围岩应变软化与剪胀效应下深埋隧道的合理支护时机,基于隧道约束收敛理论,提出围岩-支护作用2阶段分析思路,引入初期支护屈服轴力与围岩变形折减率作为合理支护时机的判据。采用三维有限差分软件求解初期支护屈服轴力与围岩变形折减率,分析不同围岩质量、支护类型、初始应力、临界塑性软化系数、剪胀角下围岩预留变形量范围,确定深埋隧道合理支护时机。结果表明:1)岩体质量与初始应力对隧道合理支护时机影响较为显著,但岩体峰后剪胀与应变软化特性较小;2)对于理想弹塑性或剪胀性不明显的岩体,采用内部支护对维持岩体稳定性非常有利,既可减小岩体的应力释放,又可增大围岩变形控制效果。If the surrounding rock with strain softening and shear dilation effect can be supported in reasonable time,it will be good for deep-buried tunnel to keep stable and save cost.Based on convergence-confinement method,a two-stage analysis method of surrounding rock-supporting interaction is proposed,and yield axial force of primary support and reduction rate of surrounding rock deformation are introduced to determine reasonable support time.Then,based on three-dimensional finite difference software,yield axial force of primary support and reduction rate of surrounding rock deformation are explored,and the reserved deformation range under the influence of different surrounding rock quality,support type,initial stress,critical plastic softening coefficient,and shear dilation angle is analyzed.The results indicate that:(1)The rock mass quality and initial stress have significant impact on the support time of the tunnel,but that of the post-peak shear dilation and strain softening behaviors is small.(2)For the rock mass with ideal elasticplastic or unobvious shear dilation,internal support is beneficial to maintaining rock mass stable,which cannot only reduce the stress release of rock mass,but also improve the deformation control effect of surrounding rock.
关 键 词:支护时机 应变软化 剪胀 预留变形量 隧道约束收敛理论
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.39.45