基于地质工程一体化的超深井提速提产——以塔里木盆地库车坳陷为例  被引量:8

ROP Improvement and Production Enhancement for Ultra-Deep Wells Based on Geology-Engineering Integration:A Case in Kuqa Depression,Tarim Basin

在线阅读下载全文

作  者:蔡振忠 徐珂 张辉[2] 王志民[2] 尹国庆[2] 刘新宇[2] CAI Zhenzhong;XU Ke;ZHANG Hui;WANG Zhimin;YIN Guoqing;LIU Xinyu(PetroChina Tarim Oilfield Company,Resource Exploration Department,Korla,Xinjiang 841000,China;PetroChina Tarim Oilfield Company,Research Institute of Exploration and Development,Korla,Xinjiang 841000,China)

机构地区:[1]中国石油塔里木油田分公司资源勘查处,新疆库尔勒841000 [2]中国石油塔里木油田分公司勘探开发研究院,新疆库尔勒841000

出  处:《新疆石油地质》2022年第2期206-213,共8页Xinjiang Petroleum Geology

基  金:国家科技重大专项(2016ZX05051);中国石油科技重大专项(2018E-1803)。

摘  要:塔里木盆地库车坳陷油气资源丰富,勘探潜力大,但地质背景复杂,目的层埋深普遍大于6000 m,甚至超过8000 m,油气勘探开发难度大。针对库车坳陷超深井地质工程特点及现存问题,基于地质工程一体化理念,提出了解决思路,并介绍了塔里木油田首口盐层下部大斜度井的成功实践。研究及实践表明,地质力学研究有利于减少钻井复杂事故并提高机械钻速,助力有利储集层优选和改造方案优化,支持钻井提速和改造提产;地质工程一体化是复杂油气藏高效开发的必然选择,需要充分发挥多学科协同工作的优势,且贯穿于各井全生命周期,以产生最大的效益,实现从井位部署、钻井工程、完井改造到采油气工程的整体进步,从而助力大油气田建设。The Kuqa depression in the Tarim basin is rich in oil and gas resources and has great potential for exploration.However,the geological setting in this area is complex and the target layers are generally buried deeper than 6000 m,or even more than 8000 m,making oil and gas exploration and development difficult.Considering the geological engineering characteristics and existing problems of ultra-deep wells in the Kuqa depression,a solution based on the concept of geology-engineering integration is proposed,and the successful practice of the first pre-salt highly-deviated well in Tarim oilfield is introduced.Research and practices show that geomechanical research is beneficial to reducing drilling complexities and increasing rate of penetration,can help select favorable reservoirs and optimize stimulation schemes,and finally support the ROP improvement and production enhancement.The geology-engineering integration is necessary for efficient development of complex oil and gas reservoirs.In this aspect,multiple disciplines will be collaborated in operations through the life cycle of each well to generate the maximum benefits and achieve overall progress from well location deployment,drilling engineering,well completion and stimulation to oil/gas production engineering,thereby facilitating the construction of large oil and gas fields.

关 键 词:塔里木盆地 库车坳陷 超深井 地质工程一体化 地质力学 大斜度井 提速 提产 

分 类 号:TE371[石油与天然气工程—油气田开发工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象