检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吉永军 JI Yong-jun(Kashi Management Bureau of Tarim River Basin in Xinjiang,Kashi 844700,Xinjiang,China)
机构地区:[1]新疆自治区塔里木河流域喀什管理局,新疆喀什844700
出 处:《水利科技与经济》2022年第3期35-40,共6页Water Conservancy Science and Technology and Economy
摘 要:新疆ZG水电站工程泄洪冲沙闸建于深厚覆盖层上,闸室渗流控制问题尤为显著。结合本工程,通过大型商用有限元软件ABAQUS,建立混凝土护坦、连接板、防渗墙、泄洪冲沙闸、砂砾石覆盖层的三维模型用于渗流计算,分析不同工况条件下上述结构渗透稳定性与渗漏量。结果表明,在不同工况下,渗透稳定性及渗漏量均满足要求,可保证泄洪冲沙闸整体稳定性以及安全运行。分析结果可为今后同类型工程提供借鉴。The flood discharge and sand flushing sluice of Xinjiang ZG hydropower station project is built on deep overburden,and the seepage control problem of sluice chamber is particularly significant.Combined with the project,a three-dimensional model of concrete apron,connecting plate,cut-off wall,flood discharge and sand flushing sluice and sand gravel overburden is established through the large-scale commercial finite element software ABAQUS for seepage calculation,the seepage stability and leakage of the above structures under different working conditions are analyzed.The results show that the seepage stability and leakage meet the requirements under different working conditions.It is very important to ensure the overall stability and safe operation of flood discharge and sand flushing sluice,so as to provide reference for similar projects in the future.
分 类 号:TV131[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38