检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐彩风[1] Xu Caifeng(China Railway Siyuan Survey and Design Group Co.,Ltd.,Wuhan 430063,China)
机构地区:[1]中铁第四勘察设计院集团有限公司,湖北武汉430063
出 处:《山西建筑》2022年第7期118-121,共4页Shanxi Architecture
基 金:铁四院科技研究开发计划课题(2013K20)。
摘 要:根据采空区移动盆地地表变形判据,结合不同等级铁路的竖曲线、倾斜及工后沉降控制标准,对控制大面积采空区工程地质选线原则的岩移角选择问题进行了深入探讨。研究表明对于大面积采空区段:高速铁路应采用边界角开展地质选线,200 km/h客货共线铁路、重载铁路与国家Ⅰ级~Ⅳ级铁路可采用相应的临界岩移角。According to the surface deformation criterion of gob mobile basin, combined with the vertical curve, inclination and post construction settlement control standards of different grades of railway, the selection of rock movement angle to control the engineering geological route selection principle of large-area gob is deeply discussed. The research shows that for large-area mined out area: high-speed railway should adopt boundary angle to carry out geological route selection, 200 km/h mixed passenger and freight railway, heavy haul railway and national grade Ⅰ~Ⅳ railway can adopt corresponding critical rock movement angle.
分 类 号:U212.32[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.216.31.88