浅析建筑电气工程配电箱柜安装质量周期管控  被引量:2

Whole Cycle Quality Control of Distribution Boxes and Cabinets of Construction Projects

在线阅读下载全文

作  者:齐向勇 Qi Xiangyong(Taikang Health Industry Investment Holding Co.,Ltd.,Beijing 100026,China)

机构地区:[1]泰康健康产业投资控股有限公司,北京100026

出  处:《智能建筑电气技术》2021年第6期61-65,102,共6页Electrical Technology of Intelligent Buildings

摘  要:配电箱柜是建筑电气系统中的核心设备,其技术管理贯穿建设工程的设计、施工、调试及运营等多个阶段,参与单位众多,施工界面复杂。任何一个环节的实施不当,都有可能导致配电系统的质量失控,影响项目的运营效率和安全。本文结合项目实例,试从建设项目全周期的角度,更加全面系统地解决配电箱柜质量管理的问题。The distribution box is a significant device in the building electrical engineering.The technical management covers all the design,implementation,commissioning and operation steps of a whole construction engineering.There are various participation roles and the construction interface is complex.Improper implementation of any step will lead to the quality incident of the distribution system,and affect the operation efficiency and safety.Combined with the project example,this paper tries to solve the problem of distribution box quality management more comprehensively and systematically from the perspective of the whole cycle of the construction project.

关 键 词:配电箱 安装 全周期 质量控制 

分 类 号:TU745.5[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象