基于预想故障集迭代的停电计划二次规划模型  被引量:3

Mixed Integer Quadratic Programming for Scheduling of Transmission Outages Based on Contingency Screening

在线阅读下载全文

作  者:梁清清 李一铭 赵静怡 代伟 LIANG Qing-qing;LI Yi-ming;ZHAO Jing-yi;DAI Wei(Department of Science and Engineering, Guangxi Agricultural Vocational University(Guangxi University Xingjian College of Sciences and Liberal Arts), Nanning 530005, China;Electric Power Dispatching and Control Center of Guangxi Power Grid, Nanning 530023, China;School of Electrical Engineering, Guangxi University, Nanning 530004, China)

机构地区:[1]广西农业职业技术大学(原广西大学行健文理学院)理工学部,南宁530005 [2]广西电网电力调度控制中心,南宁530023 [3]广西大学电气工程学院,南宁530004

出  处:《科学技术与工程》2022年第8期3119-3124,共6页Science Technology and Engineering

基  金:国家自然科学基金(52107082);广西高校中青年教师科研基础能力提升项目(2019KY0964)。

摘  要:综合停电管理是电网运行方式安排的重要工作。停电计划的优化需要考虑电网运行约束,当考虑N-1预想故障后,急剧增加了该优化问题的求解复杂度。对此,提出基于预想故障集迭代的停电计划优化方法。通过增加备选开断支路首端节点电压相角作为状态变量,将电网非线性运行约束转化为线性约束,以考虑重复停电、尽量满足初始计划、发电成本等实际工程关心的因素为目标函数,构建停电计划的混合整数线性二次规划模型;同时构建迭代补充预想故障集的框架,缩减问题的计算规模,并确保最终计划满足N-1准则。通过对IEEE 14节点与南方某局部简化的电网13节点系统进行仿真分析。仿真结果表明:所提方法能高效实现停电计划的优化调整。Comprehensive outage management plays an important role in the arrangement of power network operation mode.Network operational constraints are generally considered in power outages plan optimization.However,when considering the predicted fault of network N-1,the solving complexity of the optimization problem increases greatly.Therefore,based on preconceived fault set iteration,a power outage planning optimization method was proposed.Voltage angles at from buses of lines that require maintenance were used as additional state variables to transform the nonlinear operation constraint of power system into a linear constraint.Based on the cost of power generation,considering the repeated power outage and the initial plan as the objective function,a mixed integer linear quadratic programming model for power outages planning was established.To ensure the final plan meets the N-1 criterion,the initial plan and optimization results were checked,the framework of iteratively supplementing the expected fault was constructed to set to reduce the computational size of the problem.IEEE 14-node system and a local simplified 13-node system in southern China were simulated and analyzed.Simulation results show that the proposed method can effectively realize the optimization and adjustment of power outages plans.

关 键 词:停电计划 预想故障集迭代 混合整数规划 N-1准则 

分 类 号:TM732[电气工程—电力系统及自动化]

 