检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Jiulin LI Limin CHEN Hao XU Jianlin WANG
机构地区:[1]Tsinghua University,Beijing,100084,China [2]Beijing Urban Construction Group Co.,Ltd.,Beijing,100088,China [3]Beijing National Speed Skating Oval Management Co.,Ltd.,Beijing,100101,China
出 处:《Frontiers of Engineering Management》2022年第1期170-176,共7页工程管理前沿(英文版)
摘 要:1 Background As the basic principle of the world economy,environment,and social development,sustainable development is the focus of the international community today.In the Olympic Agenda 2020 published by the International Olympic Committee(IOC),sustainable development was officially listed as one of the core concepts of the Olympic Games.Since the beginning of the bid,the concept of ctathlete-centered,sustainable and economical”was proposed,which was highly consistent with the idea of the Olympic Agenda 2020.To implement the concept of holding“green”Olympic Games and meet the sustainability requirements of the IOC,the Organizing Committee of Beijing Winter Olympic Games issued a series of documents related to the sustainability of sports venues such as Sustainability Policies for 2022 Beijing Winter Olympic Games and Winter Paralympic Games,and strived to realize the sustainable development of sports venues in the whole life cycle of planning and design stage,construction stage,operation stage,and post-game utilization.
关 键 词:super large-span cable net structure CO_(2)Transcritical Direct-cooling Ice Making System dynamic high-precision construction measurement green construction National Speed Skating Oval
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222