作 者:李健 段军霞[2] 钟泰军 Li Jian;Duan Junxia;Zhong Taijun(Hubei Electric Power Survey and Design Institute Co.,Ltd.,Wuhan Hubei,430040;Wuhan Power Supply Company Substation Operation and Maintenance Branch,Wuhan Hubei,430000)
机构地区:[1]湖北省电力勘测设计院有限公司,湖北武汉430040 [2]武汉供电公司变电运维分公司,湖北武汉430000
出 处:《电子测试》2022年第1期134-135,127,共3页Electronic Test
摘 要:综合对比混凝土建筑配电楼(双层)、混凝土单层建筑配电间、预制舱式配电间。预制舱建筑配电间整体建筑面积最小、占地面积小,虽然土建费用最低,但舱体费用较高,整体建筑造价较高;优点主要是土建工作只需做设备条形基础,再者设备到现场后接线和调试工作量较小,建安周期最短。A comprehensive comparison is made among concrete building power distribution building (double-layer),concrete single-layer building power distribution room and prefabricated cabin power distribution room.Although the civil engineering cost is the lowest,the cabin cost is higher and the overall construction cost is higher;The main advantages are that the civil work only needs to do the strip foundation of the equipment,and the wiring and debugging workload of the equipment after arriving at the site is small,and the construction and installation cycle is the shortest.
分 类 号:TU852[建筑科学] TM63[电气工程—电力系统及自动化]