检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Jie Zhang Jing Li Cheng-bin Shi
出 处:《Journal of Iron and Steel Research International》2021年第12期1617-1624,共8页
基 金:This work was supported by the Guangdong YangFan Innovative&Entrepreneurial Research Team Program(Grant No.2016YT03C071);the Guangdong Science and Technology Special Fund Project(Grant No.SDZX202005).
摘 要:The effect of melting rate on the temperature distribution,velocity field,macrosegregation and dendrite arm spacing during electroslag remelting continuous directional solidification process with a mould of 160 mm in diameter was investigated.The mechanism of solute transport and dendrite growth of austenitic hot-work die steel during electroslag remelting process was proposed.The results showed that a lower melting rate contributed to a higher temperature gradient as well as a shallower liquid metal molten pool.With the increase in the melting rate,the central counterclockwise vortex in the slag and clockwise vortex in the liquid metal molten pool grew,whereas the marginal clockwise vortex in the slag reduced.With increasing melting rate,the macrosegregation of carbon became more serious,whereas the average value of secondary dendrite arm spacing first decreased and then increased.The secondary dendrite arm spacing reached a minimum value at melting rate of 98 kg/h,which indicated that 98 kg/h was a proper melting rate for electroslag remelting continuous directional solidification process with a mould of 160 mm in diameter.
关 键 词:Electroslag remelting continuous directional solidification Melting rate Numerical simulation Solidification structure Die steel
分 类 号:TG146.11[一般工业技术—材料科学与工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7