检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王民侠[1] Wang Minxia(Shaanxi Province Institute of Water Resources and Electric Power Investigation and Design,Xi'an 710001,Shaanxi)
机构地区:[1]陕西省水利电力勘测设计研究院,陕西西安710001
出 处:《陕西水利》2022年第3期69-72,共4页Shaanxi Water Resources
摘 要:混凝土坝应优先采用经济的坝身泄洪型式,以普化水库为例进行研究,对泄洪排沙表底孔孔数、尺寸及不同组合型式进行比较,得出无防洪任务的混凝土坝,随坝高增加而增加的投资远大于闸门尺寸变化所增加的投资,选用较大泄洪规模是降低工程投资的有效途径。当坝高由校核洪水位确定时,泄洪规模越大枢纽投资越省,当坝高由设计洪水位或正常蓄水位控制时则无需继续加大泄洪规模。The concrete dam should give priority to the economical flood discharge type of the dam body. Taking the Puhua Reservoir as an example, the number, size and different combination types of bottom holes on the surface of the flood discharge and sand discharge surface are compared. It is concluded that for concrete dams without flood control tasks, the increase of investment with the increase of dam height is much greater than that of the change of gate size. Selecting a larger flood discharge scale is an effective way to reduce project investment. When the dam height is determined by the check flood level, the larger the flood discharge scale, the more economical the pivotal investment is. When the dam height is controlled by the design flood level or the normal water storage level, there is no need to continue to increase the flood discharge scale.
分 类 号:TV621[水利工程—水利水电工程] TV642.2
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49