检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡冲 Hu Chong(Dashucun Mine Jizhong Energy Fengfeng Group,Handan 056300,China)
机构地区:[1]冀中能源峰峰集团大淑村矿,河北邯郸056300
出 处:《煤炭与化工》2022年第3期29-31,共3页Coal and Chemical Industry
摘 要:针对综放工作面三角煤丢采造成资源回收率低的问题,峰峰集团大淑村矿172402工作面切眼首次采用摸2号煤顶板、底板配合培顶工艺,通过将巷道原锚网索支护、切眼摸顶、摸底与培顶结合,形成完整的支护体系,切眼卧底后最终高度达到5.2 m,提高回采率,达到综采工作面回收底三角煤的目的,对类似条件工作面准备和切眼成巷具有一定参考价值。In view of the low recovery rate of resources caused by the loss of triangular coal in the fully mechanized top coal caving face,the technology of reaching roof and bottom,roof support of Coal No.2 in Face No.172402 of Dashucun Mine was firstly adopted.A complete support system was formed through the combination of original anchor mesh cable support,reaching roof and bottom,roof support.The final height of the open-off cut reached 5.2 m after undercover.This method improved the recovery rate,achieved the purpose of recovering the bottom triangle coal in the fully mechanized mining face,and there was a certain reference value for the preparation of the working face under similar conditions.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.236