检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:廖明山 LIAO Mingshan(State Grid Quanzhou Power Supply Company,Quanzhou 362000,China)
出 处:《电工技术》2022年第3期93-95,共3页Electric Engineering
摘 要:介绍了一种变电站二次屏柜顶部小母线拆除过程中,防止电压短路或接地的防范措施。首先介绍了220 kV变电站保护改造过程中,屏顶小母线拆除时,电压短路造成母线失压的情况及原因,其次从工具选择与包扎、施工前小母线的处理、施工工艺、后续处理和注意事项5个方面详细介绍整改及防范措施,最后总结整改及防范措施的应用效果。A preventive measure to prevent voltage short circuit or earthing during removing small busbar on the top of secondary panel in substation is introduced.Firstly,in the process of 220 kV XX substation protection transformation,when the small bus on the top of the screen is removed,the situation and reason of voltage short-circuit caused bus voltage loss are introduced.Secondly,the rectification and preventive measures are introduced in detail from 5 aspects:tool selection and bandaging,small busbar treatment before construction,construction technology,follow-up treatment and precautions.Finally,the application effects of rectification and preventive measures are summarized.
分 类 号:TM774[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15