检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:於少良 于洋 Yu Shao-liang;Yu Yang
出 处:《电力系统装备》2022年第2期126-128,共3页Electric Power System Equipment
摘 要:尼日利亚宗格鲁水电站厂房内共安装4台单机容量175 MW立轴混流式水轮发电机组,全部由GE通用电气水电设备(中国)公司供货。对现场组装的发电机定子进行磁化试验,是检验定子铁芯装配质量的重要方法,也是检验定子铁芯自身绝缘性能的重要工序。本文主要介绍其首台水轮发电机组(1号)定子磁化试验。The powerhouse of Zungeru Hydropower station in Nigeria houses four vertical Francis turbine-generator units of 175 MW each.All units are manufactured by General Electric Hydro-power(China)Co.,Ltd.Conducting magnetic test on field-assembled generator stator is not only an important method of inspecting the installation quality of stator core,but also an important process of checking the insulation performance of stator core itself.This article gives a brief introduction on the Stator Core Magnetization test of the first turbine-generator unit(1#).
分 类 号:TM75[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.91