高效气浮在污水厂极限除磷提标设计中的应用  被引量:4

Application of High Efficiency Air Floatation Technology in Design of Advanced Phosphorus Removal in Upgrading of Sewage Treatment Plant

在线阅读下载全文

作  者:陈奇良 CHEN Qi-liang(Sixth Design Institute,Shanghai Municipal Engineering Design Institute Group Co.,Ltd.,Anhui Hefei 230061,China)

机构地区:[1]上海市政工程设计研究总院集团第六设计院有限公司,安徽合肥230061

出  处:《广州化工》2022年第6期124-126,共3页GuangZhou Chemical Industry

摘  要:巢湖流域TP本底浓度偏高,降低水体TP含量可有效抑制巢湖蓝藻水华的暴发。污水处理厂尾水中的TP为巢湖总磷污染的重要来源之一,合肥市某污水处理厂极限除磷提标设计中,通过改造现有构筑物,新建高效气浮处理单元,将出水TP在0.3 mg/L降至0.05 mg/L以下,建设、运营管理方便。详细介绍了该厂提标改造的工艺路线、主要构筑物设计,可为其他类似工程的建设提供借鉴。The background concentration of TP is high in Chaohu Lake,and reducing the content of TP in water can effectively inhibit the outbreak of cyanobacteria bloom in Chaohu Lake.TP in the tail water of sewage treatment plant is one of the important sources of total phosphorus pollution in Chaohu Lake.In the design of advanced phosphorus removal of a sewage treatment plant in Hefei,by transforming the existing structures and building a new high-efficiency air flotation treatment unit,the effluent TP was reduced from 0.3 mg/L to less than 0.05 mg/L,which was convenient for construction,operation and management.The process route and main structure design of the upgrading and reconstruction of the plant were introduced in detail,which can provide reference for the construction of other similar projects.

关 键 词:高效气浮 极限除磷 提标改造 

分 类 号:X703[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象