检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈阳 周维洪 张方海[3] CHEN Yang;ZHOU Wei-hong;ZHANG Fang-hai(CNOOC Energy Technology&Services-Oil Production Services Company,Tianjin 300452,China;The Shenfu Branch of the company of Zhonglian of CNOOC,Shenmu 719300,China;The Wen Chang Branch of Zhanjiang Oil Production Services of CNOOC Energy Development Co.,Ltd.,Zhanjiang 524000,China)
机构地区:[1]中海油能源发展股份有限公司采油服务分公司,天津300452 [2]中海油中联公司神府分公司,陕西神木719300 [3]中海油能源发展股份有限公司湛江采油服务文昌分公司,广东湛江524000
出 处:《化工管理》2022年第10期127-130,共4页Chemical Engineering Management
基 金:广西重点研发计划“北部湾涠洲近海边际油田移动式井口平台研发与工程示范应用”(桂科AB20159012)。
摘 要:注水泵是石油天然气工业开采生产中应用较为普遍的一种机械设备,尤其是在石油石化行业中应用更为广泛。注水泵作为生产污水回注系统中众多设备当中最为核心的关键设备,其对经处理合格之后的生产污水回注效果起着举足轻重的作用。然而,在生产实践污水回注过程中,常常出现注水泵运转时震动过大的现象,这样导致设备维修人员频繁维修拆泵,并更换机械零部件。不仅增加了设备维修人员的工作量,而且造成了运营成本增加,倘若检修不及时到位,势必造成生产污水回注系统停运,进一步导致停产。文章从注水泵震动过大的原因进行全面剖析,并结合生产工艺现状提出了改造措施,经改造之后,获得了满意的预期效果,赢得了高度评价。Water injection pump is a kind of mechanical equipment widely used in oil and gas production practice,especially in petroleum and petrochemical industry.Water injection pump as the most core of many equipment in the production sewage reinjection system,it plays a pivotal role in the production sewage reinjection effect after qualif ied treatment.However,in the process of sewage reinjection in production practice,the phenomenon of excessive vibration of water injection pump during operation often appears,which leads to frequent maintenance,disassembly and replacement of mechanical parts by equipment maintenance personnel.It not only increases the workload of equipment maintenance personnel,but also increases the operating cost.If the maintenance is not in place in time,it will inevitably lead to the shutdown of the production sewage reinjection system,which will further lead to the shutdown.In this paper,the causes of excessive vibration of water injection pump are analyzed comprehensively,and combined with the present situation of production technology,the transformation measures are put forward.After the transformation,satisfactory expected results are obtained and high evaluation is won.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.143.7.73